您好,欢迎来到爱站旅游。
搜索
您的当前位置:首页缩短合同审批流转时间

缩短合同审批流转时间

来源:爱站旅游
缩短合同审批流转时问 庄陆挺 浙江省围海建设集团股份有限公司“智慧围海”QC小组 (浙江省围海建设集团股份有限公司,浙江宁波【摘315040) 要】 Qc小组成员根据公司合同审批过程中存在的问题,设立目标值。灵活运用Qc工具找出问题症结,用 关联图透彻分析原因,合理选用PDPC预案及优选法进行对策实施,最终缩短了合同审批流转时间,完成了目标值。 【关键词】 合同;审批;流转时间;缩短 中图分类号:TU723.1 文献标志码:A 文章编号:1005-4774(2015)02-0078-04 Shortening of Contract Examination and Approval Turnaround Duration ZHUANG Lu—ting Zhejiang Reclaim Construction Group Co.,Ltd.‘Wisdom Reclamation’QC Team (Zhejiang Reclaim Construction Group Co.,Ltd.,Ningbo 3 1 5040,China) Abstract:Members in Qc team set up target values according to problems in company contract examination and approval process.Qc tools are flexibly utilized for discovering causes of problems.Causes are thoroughly analyzed by association graph.PDPC plan and optimal seeking method are rationally selected for countermeasure implementation.Contract examination and approval turnaround time is finally shortened,and the target value is completed. Keywords:contract;examination and approval;turnaround time;shortening 1 课题简介 工程管理部(质量管理部)是公司合同管理部门。 合同审批流程环节由工程管理部、法务部、商务部、资 财管理部、副总经理等组成。 成本管理要求横向到边、纵向到底,公司支付项目 部工程款须以审批完的合同为依据,合同审批工作量 大,时间紧。因此,成立了以公司副总经理为组长、各 亮任组长,组员包括庄陆挺、仇志清、夏平华、王狄青、 金新、薛归、陈味、冯宗义,是一个技术全面、专业能力 强的团队。 3选择课题 根据公司要求,月度合同审批流转时间平均不超 过5d(周末、节假日不计在内,每天工作时间按8h 计)。根据2013年1~5月调查,合同审批平均时间大 于5d,故选定课题为“缩短合同审批流转时间”。 4现场调查 相关部门人员参与的Qc小组,研究如何缩短合同审 批流转时间。 2 QC小组概况 a.现状调查表。按每份合同审批流转所用时问 抽查2013年度第二季度90份合同审批记录,详见下 页表1。 Qc小组成立时间为2013年5月,由参与合同审 批的相关部门共10名成员组成。公司副总经理戈明 ・78・ 

因篇幅问题不能全部显示,请点此查看更多更全内容

Copyright © 2019- azee.cn 版权所有 赣ICP备2024042794号-5

违法及侵权请联系:TEL:199 1889 7713 E-MAIL:2724546146@qq.com

本站由北京市万商天勤律师事务所王兴未律师提供法律服务